Debrecen
Design:
2023
Constructed:
2024
Arrival at the site reveals the large factory hall, where the office units are located in the main building, adjacent to it. On the second floor of the main building there is an outdoor terrace with an important visual link to the garden. The main entrance area is divided into two parts. Each garden section surrounds a longitudinal ornamental pool. In the pool, custom concrete planters – so called pre-formed concrete rock gardens with planting medium – have been created. The pool is framed by biodiverse perennial beds planted with waterside and water-party plants, interspersed with paths and benches. To the east of the factory building, a leisure zone with a large lawn and oak trees along the axis of the pool was added. The seating area is framed by a variety of green borders and trimmed hedges along the site perimeter. The oak recreation area is framed by waving trimmed evergreen yew hedges.