Debrecen
Design:
2023
Constructed:
20204
For the new Társ95 Ltd. manufacturing facility, we installed custom-made concrete blocks in the yard. The rock formations are located in the reception area, in the pavement, in the water basin and in the green area. A total of 12 rock pits were built, 2 of which are used as sculpture bases and 10 as planters with shrubs and ground-covering perennials.